The sequence can be stopped and re-started at any time using the panel mounted Stop and Start switches. Ensure that the following details are also met: (This exercise is based on LogixPro PLC simulator)Ĭompletely design and de-bug a ladder control circuit which will automatically position and fill the boxes which are continuously sequenced along the conveyor.